CgMOSES for FMCG

High-velocity lines. Higher-velocity changeovers.

For plants where the differentiator is line efficiency and changeover speed. Pack, fill, label, palletise — with the visibility to know exactly where the next minute of OEE is hiding.

HACCPBRCGS / FSSC 22000SKU velocityCIP / SIP

For plants where the differentiator is line efficiency and changeover speed. Pack, fill, label, palletise — with the visibility to know exactly where the next minute of OEE is hiding.

+18%
Reduction in changeover time after 6 months on MOSES.
+9%
Lift in pack-line OEE on the slowest line.
100%
Of CIP cycles auto-verified before next batch runs.

FMCG runs on changeover speed

FMCG plant heads don't lose sleep over availability — modern equipment is usually fine. They lose sleep over changeover time, format change, and the 30-minute hole at the start of every new SKU run.

MOSES gives you minute-by-minute visibility into where the changeover is — operator on step 4 of 12, cleaning cycle 80% complete, fill heads recalibrated, label format verified. Stack a thousand changeovers and you start finding the systemic patterns. That's the OEE you're leaving on the floor.

FMCG-specific capabilities

  • SKU-aware OEE — losses attributed correctly to changeover, not blamed on the line.
  • CIP / SIP integration — cleaning cycles tracked, verified, and gated against next-batch start.
  • Batch and pallet tracking — full lot genealogy from raw input to despatched pallet.
  • Recipe & formula management — versioned, locked, enforced at the operator UI.
  • Tare and weight verification — sub-meter integration on fill heads, real-time deviation alerts.
  • Cold-chain monitoring — temperature probes across cold rooms, vans and reefer trailers.

The 28-plant rollout pattern

FMCG groups don't deploy software one plant at a time. They deploy once, then roll out to 28. We've done this. The playbook:

  1. Choose a lighthouse plant — typically the most-watched one in the network.
  2. Run the standard 8-week pilot. Document everything as a deployable "blueprint."
  3. Roll out to wave 2: 3–5 similar plants, in parallel, with a deployment engineer per site.
  4. Wave 3 and beyond: customer-led, with MOSES on call.

By plant 6, your own team is running the rollouts. We just bring the platform.

See what your fmcg plant looks like on MOSES.

A working demo with mock data is one click away. A real one — with your data — is one conversation away.